PDX Taxiway C East Rehabilitation and Runway

Reconstruction of Taxiway C eastof Taxiway E, Taxiway C5 and C8-North with portland cement concrete pavement.  Rehabilitation of connecting Taxiways J, C6-North, C6-South, and C8-South witha mill and Inlay.  Removal of damaged portland cement concrete pavement on Runway 10R-28L and replacement with new concrete pavement. Reconstruction of portions of the perimeter road at connecting taxiways. Grading and drainage improvements.  Removal and replacement of existing in-pavement lights and edgelights, and reconstruction of the Taxiway C8 holdbar. Widening paved shoulders from 15 feet to 35 feet.  Providing an east-west hydrant water line from GateSA76 to the west portion of Taxiway C1 and from Taxiway F to the east portion of N.E. 82nd Avenue. Construction of taxiway duct bank crossings and communication vault modifications.  Replacement of a Port sanitary sewercrossing and installation of a connecting sewer including a new sanitary sewer pump station. Construction of a Pacific Power & Light (PP&L) duct bankcrossing.

Back to Current Projects »

 

"K&E’s  product was installed exactly to the plans and specifications and their flexibility in executing the overall project schedule was outstanding. This project required significant coordination with the electrical and H-pile installation contractors, K&E’s support in this area  contributed heavily to the success of the project."

- James W. Stone
Stantec Consulting Services
Scarborough, ME

(Project refers to two solar powered generation facilities in Amity, Oregon.)